3 Footings and Foundations
16%
- Footings (5%)
- Stepped Footings and Special Foundations (3%)
- Columns and Piers (3%)
- Site Preparations, Foundations, and Basement Walls (5%)
5 Wall Construction and Coverings
27%
- Lumber Quality – Walls (4%)
- Wood Framing – Walls (4%)
- Header Spans (2%)
- Steel Framing (2%)
- Fireblocking (2%)
- Masonry Materials and Placement (2%)
- Concrete Wall Inspection (2%)
- Braced Wall Panels (2%)
- Interior Coverings (2%)
- Exterior Sheathing, Veneers, and Weather-Resistant Coverings (3%)
- Exterior Plaster, Stucco, and Lath (2%)
6 Roof/Ceiling Construction
14%
- Roof/Ceiling Insulation and Vapor Barriers (2%)
- Attics/Ceiling (2%)
- Roof Framing (4%)
- Roof Sheathing (2%)
- Roofs and Roof Coverings and Reroofing (2%)
- Fireplaces and Chimneys (2%)
7 Public Safety and Special Construction
17%
- Means of Egress (4%)
- Exit Stairways and Ramps (3%)
- Exterior Construction (3%)
- Smoke Detectors (2%)
- Flamespread of Insulation and Finishes (2%)
- Safety Glazing (3%)